Run report, 2026-11-12 (run 20261112T004426Z-wnyybl)

Cycle 1: review

What this cycle did. The selector (the tool that picks each cycle's job from what is most overdue) chose review: a second reading of entries that are already published. Its reason was that review had the highest "scheduler debt", meaning it had gone longest without its fair share of runs. It allowed up to twenty entries and US$3 of paid model calls. There were no draft entries waiting, so the cycle continued the B1 coverage pass (your ruling of 2026-10-24: re-read the most important band-1 words, those with the most senses first, and add whatever a learner would miss). The next four unread five-sense entries were record (noun), red (adjective), report (noun), and return (verb). Receive was skipped because it had already been read on 2026-10-24.

Before the work. No pull requests were left open by an earlier run, inbox/ (the folder where you leave instructions) was empty, and there were no "Entry report" issues from readers. The old branch claude/friendly-mayer-mdy32d still holds nothing that is not already in main. It already has its line in reviews/needs_curator.txt asking you to delete it, because these runs cannot delete branches.

What changed in the entries.

What the reviewers found and what I decided. Each entry goes to two reviewer models from different companies, which check every field and mark each problem as blocking (it must be settled before publishing) or minor. They raised 47 issues, 8 of them blocking. I applied 33 and rejected 14, and every decision is logged with a reason in reviews/decisions.jsonl.

Other fixes. My first draft of the politics definition named the Republican Party, and the defining-vocabulary check flagged it, because proper names are allowed in definitions only by a logged decision. The definition now says the main party on the right in American politics, and the party's name appears only in the culture note. The cross-reference tool added no new links.

Spend. US$0.23 for this cycle. Reviewer A runs on your subscription at no charge. The day's total is US$0.23 of the US$15 cap.

What did not work. Nothing failed. One small slip: I logged one decision twice by mistake and removed the extra line before committing.

What is next. The coverage pass now stands at 295 entries. The next ones are right (adverb) and roll (verb). Blue (adjective) should get the matching politics sense (a blue state) at its next review.

What needs you. Nothing new.

Cycle 2: build

What this cycle did. The selector chose build: new entries taken from the queue, the ordered list of words still waiting for an entry. It allowed up to twelve entries and US$3. I claimed eight, fewer than the cap, so that each could be written in full. Eight entries were published: march (the walk), March (the month), marker, marketing, mask, mat, mate, and mattress. All are band 2 (the second most common group of words).

Two queue problems sorted out first.

What the entries contain. A few points worth knowing:

What the reviewers found and what I decided. The two reviewers raised 29 issues, none blocking. I applied 21 and rejected 8.

Other fixes. Five words, in seven places, were outside the defining vocabulary (the limited word list that definitions must use), so I reworded those definitions: steady, opponent, oxygen, captain, and rank. The cross-reference tool could not choose a sense in two places, so I placed those links by hand: marker in sign (evidence sense) and mate in friend (first sense).

Spend. US$0.27 for this cycle. The day's total is US$0.50 of the US$15 cap.

What did not work. Nothing failed.

What is next. The queue continues after mattress.

What needs you. Nothing new.

Cycle 3: site

What this cycle did. The selector chose site: rebuild the public website from the entries and run the automatic browser checks on it. The site had last been checked on 2026-11-10, so it was its turn. The build script (tools/build_site.py) turned all 4,210 entries into 3,518 headword pages. Some headwords have more than one entry on the same page, such as the noun and the verb. No drafts were held back, because every entry is reviewed. The checking script (tools/site_check.py) opens the site in a real browser at phone width (360 pixels) and desktop width. It tests search, misspelling suggestions, the menu, dark mode, the sense menu on long entries, grey links to entries that do not exist yet, and sideways scrolling on every page. All 79 checks passed.

Spot checks on today's changes. The march page shows both new entries, the walk and the month. Each has its own anchor (a named place on the page that a link can jump to). The February entry's "see also" link goes straight to the month entry, and the polite entry now links to manner instead of the missing manners. Nothing needed fixing.

Spend. Nothing. This mode makes no paid calls.

What did not work. Nothing failed.

What needs you. Nothing.

Cycle 4: build

What this cycle did. The selector chose build again, with room for twelve entries and US$3. This was the fourth and last cycle a run may have, so I claimed only six words from the queue. All six were written, checked, and published: means, mechanic, mechanism, medal, medication, and membership. All are band 2 nouns.

What the entries contain.

What the reviewers found and what I decided. The reviewers raised 16 issues, 3 of them blocking. I applied 15 and rejected 1.

Other fixes. The cross-reference checker found that medicine listed medication as a synonym while my draft had medicine only as a "compare" word. I made them match. I placed one link the tool could not place by hand: medication now appears in the medicine sense of drug.

Spend. US$0.18 for this cycle. The run's total is US$0.67, which is the day's total so far, against the US$15 daily cap.

What did not work. Nothing failed. The drug entry already carried a warning that its usage note and its synonym note share most of their words. That predates this run and is left for its next review.

What is next. The queue continues after membership. The coverage pass continues with right (adverb) and roll (verb). The next weekly digest is due on 2026-11-14.

What needs you. Nothing new.

All journal entries