Run report, 2026-11-11 (run 20261111T004433Z-co8yne)

Cycle 1: build

What this cycle did. The selector (the tool that picks each cycle's job from what is most overdue) chose build: writing new dictionary entries from the queue, the ordered list of words still to be written. A build cycle may write at most twelve entries; this one wrote all twelve, taken in queue order: jelly, journalism, journalist, laptop, laughter, launch, lawn, lawsuit, lead, leadership, learner, and learning, all nouns. The dictionary now has 4,160 entries, every one of them marked reviewed.

Before the work. There were no open pull requests left by an earlier run, nothing in inbox/ (the folder where you leave instructions), and no open "Entry report" issues from readers. The one old work branch on GitHub, claude/friendly-mayer-mdy32d, holds nothing that is not already in main, and it already has a line in reviews/needs_curator.txt asking for it to be deleted.

The entries. A few points worth knowing:

What the reviewers found and what I decided. Every entry goes to two automatic reviewers from different companies, who check each field against the house rules. They raised 42 issues, of which 2 were blocking (must be settled before the entry can be published). Both concerned the same thing: in jelly's third sense, marked uncountable, one example said a clear jelly, which is a countable use. The example also stated a science fact about frog eggs, which examples must not do, so I replaced it with an ordinary sentence rather than change the grammar label.

Of the 40 minor issues, I accepted 37 and rejected 3. The accepted ones were mostly small corrections: collocations filed under the wrong type (grape jelly is noun plus noun, not adjective plus noun), one definition of laughter that used laughing (a dictionary should not define a word with its own close relative), a misleading note that suit (as in lawsuit) is "used mainly by lawyers", and a translator's note on lead that only listed its senses without naming a real trap. On lead, the first reviewer also rightly pointed out that a lead role uses lead as a modifier rather than as the noun being defined; the example now reads the lead in a new TV series. That reviewer also noticed that the business sense, a possible customer, was missing; it was added. I rejected three suggestions to restructure senses, each with a logged reason: launching a ship stays a subsense of launching a rocket, the example and first-to-act uses of lead stay together, and market leadership is covered by the first sense of leadership.

Five definitions were reworded afterwards to keep them within the defining vocabulary (the list of plain words definitions are written in): for example occasion became event, and spacecraft became into space. Five cross-references from other entries back to the new ones had to be placed by hand, because the tool could not tell which sense of the other entry they belonged to (introduction, case, clue, cable, student).

Spend. US$0.32 for the pronunciation panel and the second reviewer; the first reviewer runs on your subscription at no charge. All 24 transcriptions were confirmed on the first pass.

What did not work. Nothing failed. My first drafts had five definitions outside the defining vocabulary and several collocation-type mistakes, all caught by the checks.

What is next. The selector picks the next cycle. Queue order continues after learning.

What needs you. Nothing new from this cycle.

Cycle 2: review

What this cycle did. The selector chose review: rereading entries that are already published to improve them. There were no unreviewed drafts and no reader reports, so the cycle continued the coverage pass. This is your ruling B1 of 2026-10-24: the 500 most important common words are reread to check that every frequent present-day use, idiom, and pattern is covered. The pass goes through the entries with the most senses first. This cycle took the next four: only (adverb), paper (noun), pay (verb), and personal (adjective). The one entry between them in the list, out (preposition), is a function word. Function words have a later round of their own, so it was left for that. The pass now stands at 283 entries.

What I changed before the reviewers saw the entries.

What the reviewers found and what I decided. The two automatic reviewers raised 58 issues. Four were blocking:

The reviewers also found real gaps, and I added them:

Several definitions were reworded and several repeated facts removed. In total I applied 47 suggestions and rejected 11, each with a logged reason. Two rejections: give stays a synonym of pay, because one sense of give means exactly that (I gave him ten dollars for it); and pay the price belongs under price, because idioms go under their first noun. price does not have that idiom yet, so it is now on the list in NEXT.md.

Spend. US$0.21 for this cycle. US$0.53 for the day so far, against a daily cap of US$15.

What did not work. Nothing failed.

What is next. The coverage pass continues with pick (verb).

What needs you. Nothing new.

Cycle 3: build

What this cycle did. The selector chose build again, which means writing new entries from the queue. A build may write up to twelve entries. I took eight: this was the run's third cycle, and the rules prefer fewer, fuller entries to a full but thinner batch. The eight words, in queue order, are lecture, left (the noun), legislation, lemonade, liar, lifestyle, lifetime, and light bulb. The dictionary now has 4,168 entries, all reviewed.

The entries.

What the reviewers found and what I decided. The two automatic reviewers raised 31 issues. None were blocking. I applied 22 and rejected 9, each with a logged reason.

What I applied:

What I rejected:

The cross-reference tool left two links back to the new entries for me to place by hand:

Spend. US$0.20 for this cycle. US$0.73 for the day, against a daily cap of US$15. All 16 transcriptions were confirmed on the first pass.

What did not work. Nothing failed. NEXT.md went five words over its 1,000-word cap when this cycle's notes were added, so I shortened two lines.

What is next. The next cycle starts if the run clock allows it. The queue continues after light bulb.

What needs you. Nothing new.

All journal entries