Journal, 2026-10-24 (seventh run of the day)

Cycle 1: build

What the cycle did. The scheduler (tools/next_mode.py, the script that picks each run's kind of work) chose build: writing new entries from the queue, the ordered list of words still to be written. It gave this reason: build had waited longest among the kinds of work that were allowed. Closure (writing entries for words the dictionary already uses in its definitions) is blocked until milestone 1 is finished. Milestone 1 is the first target: an entry for every word on the defining vocabulary list, the roughly 2,400 plain words that definitions are written in. Before this cycle it had 258 rows left.

The queue handed out twelve number words, and all twelve were written and reviewed:

Every entry went through the full pipeline: the schema check, the inflection tool, the pronunciation check (all 24 transcriptions, American and British, were confirmed by the voting models), the two outside reviewers, my decisions on each problem they raised, and the final checks.

What the reviewers found and what I decided. The two reviewers raised 41 issues; I applied 28 and rejected 13, and none needed the owner.

New queue rows: fourth and fifth as nouns (the fractions, a fifth of the class), fifty-fifty (adjective), and the ordinals from eleventh to ninetieth. They wait unbanded until the next band vote, the step where the word-list panel gives each row a frequency band.

Spend. About US$0.70 for this cycle (the reviewers and the pronunciation check). The day's total is about US$10.68 of the US$15 daily cap.

What did not work. Nothing broke. One reviewer raised seventeen issues on fourth alone; about half of them repeated the date objection on each field, which is noise rather than a fault.

What is next. The remaining numbers (twelve, thirteen, sixteen, twenty, thirty, sixty) are next in the queue and should follow the same shapes. After them, milestone 1 continues in queue order.

What needs the owner. Nothing new from this cycle. The open questions in NEXT.md still stand.

Cycle 2: site

What the cycle did. The scheduler chose site, the check of the public website, because the site check had waited longest among the allowed kinds of work. The website is not stored in the repository: it is built from the entry files by a script (tools/build_site.py) each time the project's automatic checks run, and published at https://tkgally.github.io/eex-dict/. In this cycle I built the site locally and ran the site checker (tools/site_check.py). The checker opens the pages in a real browser, at a phone width (360 pixels) and a desktop width, and tests what a reader does.

The build made 2,430 headword pages from 2,816 entries. A headword page can hold more than one entry: forty the number and any other part of speech of the same word share a page. No entry was held back as an unfinished draft. There were no redirects, the stub pages kept for renamed entries.

What the checks found. All 79 checks passed. They cover:

I also opened the new number pages from cycle 1 (forty, fourth). They show the new plural sense (in her forties) and the fourth place examples.

What changed. Nothing in the site tools or templates; nothing needed fixing. The only file this cycle changes, apart from the record-keeping, is the metrics history (metrics/history.jsonl), which now records that the site build was fine.

Spend. None. This kind of work makes no paid calls.

What is next. The next cycle goes back to the scheduler. Building milestone 1 is still the main line of work. The remaining numbers (twelve, thirteen, sixteen, twenty, thirty, sixty) are next in the queue. A lint pass is due in about two runs. (Lint is the periodic full check of the wiki and the entries for contradictions, broken links, and stale notes.)

What needs the owner. Nothing new.

Cycle 3: build

What the cycle did. The scheduler chose build again, for the same reason as in cycle 1. It handed out twelve rows from milestone 1. All twelve were written and reviewed through the full pipeline.

All 24 transcriptions (American and British) were confirmed by the pronunciation check.

What the reviewers found and what I decided. The reviewers raised 34 issues. I applied 19 and rejected 15; none needed the owner.

Fixes outside the batch. The cross-reference tool reported two places where a link needed a person's choice, and I placed both by hand: drill now lists bore as a synonym, and although now points to whereas. I also caught an error of my own in twenty: it listed twelve as a family word. I removed it on both sides.

Two small inconsistencies in entries merged in cycle 1 are left for a review cycle; they are listed in NEXT.md. The money sense of fifty says "marked with the number 50", where twenty now says "with a value of 20". And eleven and ten list each other as family words, though they share no form.

Spend. About US$0.67 for this cycle. The day's total is about US$11.35 of US$15.

What is next. Milestone 1 continues in queue order. A lint pass is due soon.

What needs the owner. Nothing new.

Cycle 4: lint

What the cycle did. The scheduler forced a lint pass, because ten runs had gone by since the last one. Lint is the periodic check of the whole project. It runs the mechanical checks over all 2,828 entries, then reads the wiki (the project's knowledge base of rules, decisions, and notes) for problems a script cannot see. No entries were written or rewritten. This was the eighty-sixth pass.

What the checks found and what I did.

What did not work. The band vote tool overwrote the record of an earlier vote from the same day. Those votes had already been applied, so nothing was lost from the queue, but the record file had dropped 16 rows. I merged them back. The vote tool also wants its --votes path relative to the vote folder, which failed the first time. I wrote both problems up as a note (wiki/notes/band-vote-unbanded-overwrite.md) for a fix in a later run, as the project's rules require.

Spend. Less than one cent. The day's total is about US$11.36 of US$15.

What is next. Building milestone 1 continues, along with the two small fixes from cycle 3 listed in NEXT.md. The next lint is due in ten runs.

What needs the owner. Your judgment on reviewer A's coverage check (above), if you want to change it. The questions already listed in NEXT.md are still open.

All journal entries