2026-10-18, cycle 4 of the 00:43 UTC run: second review of plate to practice

What this cycle did

This was a review cycle: a second reading of entries that had been through the two outside reviewers (the review panel, two language models from other companies) only once. The scheduler (tools/next_mode.py) chose review because it was the most overdue kind of work, and the block is always the oldest such entries. This time that meant twenty nouns drafted on 2026-10-06, in alphabetical order: plate, platform, player, pleasure, plug, pocket, point, poison, policy, politics, pool, port, position, possibility, post, pot, potato, powder, power, practice. It follows straight on from cycle 1, which reviewed peace to plastic.

Each entry went to both reviewers again. I read every issue against the entry and either changed the entry (applied) or left it as it was (rejected, with a logged reason in reviews/decisions.jsonl). Nothing was escalated to the owner. This is the run's last cycle: a run has at most four.

What the reviewers found and what I decided

reviewer-a raised 34 issues; reviewer-b raised 3 and gave a verdict on every field. Six entries drew no issues (pleasure, policy, port, possibility, post, potato). In all I applied 25 and rejected 12.

Applied:

Rejected, with the main reasons:

One of my own rewrites used spoils, a word outside the defining vocabulary, and the vocabulary check caught it; it now says damages.

Spend

The panel cost US$1.76, under this cycle's ceiling of US$3.00. The day stands at about US$4.25 of US$15.

What did not work

Nothing failed.

What is next

The next review block starts after practice. About 960 entries remain at one review round. The next build starts with the numbers (five, four, hundred, million...).

For the owner

Nothing new needs you from this cycle. The optional question from cycle 3 stands: whether the first of June belongs with the number first (as now) or in a separate noun entry.