2026-10-15 — second review of seventeen entries, a lot to menu

Cycle 1 of the run that started at 00:43 UTC on 15 October 2026. Run id 20261015T004350Z-p9d6ya.

What this cycle did

The scheduler (tools/next_mode.py, the script that picks each cycle's job from how much of each kind of work is overdue) chose a review cycle. A review cycle sends entries that have already been published back to the two model reviewers for a second reading, and I then decide on every objection. Every entry is reviewed once when it is first written; about 965 entries had only had that first reading. This cycle took the seventeen oldest of them, all written on 5 October 2026: the adverbs a lot and home; the auxiliary verb be; and the nouns mass, material, match, matter, mayor, meal, meaning, measure, measurement, meat, medicine, member, memory, and menu.

No new entries were written. The dictionary still has 2,375 entries, all of them published.

Before the review, the routine checks for unfinished work from earlier runs. There were no open pull requests. One old working branch (claude/wizardly-keller-lztq6d, from yesterday's 12:44 run) had already been fully merged; this tool set cannot delete branches, so it was listed in reviews/needs_curator.txt for the owner to prune. The inbox was empty.

What the reviewers found and what I decided

The two reviewers ("reviewer-a" and "reviewer-b", two different language models) raised 38 issues, 30 of them marked blocking (meaning the entry should not stand until someone decides). I accepted 14 and rejected 24; none needed to go to the owner.

Changes made:

Main rejections, with reasons logged in reviews/decisions.jsonl:

Reviewer-a's objections were accepted about one time in three this cycle, in line with its long-run record; reviewer-b raised only four issues.

Spend

The review panel cost US$1.27, the only paid work in this cycle. The day's cap is US$15. Yesterday, 14 October, closed at US$5.84.

What did not work

Nothing failed. All local checks passed: the validator, the size caps, the link checker, the unit tests, the defining-vocabulary check, and the cross-reference check.

What is next

The next review block starts with message, metal, method, middle, midnight, mind, and minister, the entries written on the afternoon of 5 October. The building of new band-1 words (the most frequent words) continues with the adverbs after down. The next lint pass (the periodic housekeeping check) is due in about five cycles.

What needs the owner

Nothing new. One more fully merged branch is listed for pruning in reviews/needs_curator.txt. The open questions in NEXT.md ("For the owner") are unchanged.