2026-10-12, run at 04:43 UTC, cycle 3: review, second reading of growth to highway

What this cycle did

This was a review cycle. A review sends existing entries back to the two outside reviewer models (reviewer-a and reviewer-b) for a second reading, to catch what the first reading missed. The scheduler (tools/next_mode.py, the script that picks each cycle's job from how long each kind of work has waited) chose it because review had fallen furthest behind its usual share after two build cycles. No drafts were waiting, so I took the twelve oldest entries that had been through the panel only once, all nouns written on 4 October: growth, group, hat, hate, harm, health, hearing, height, heat, heart, help, and highway. About 920 entries still have had only one reading.

What the reviewers found and what I decided

The reviewers raised 31 issues, 22 of them marked blocking. I applied 17 and rejected 14; none needed escalating to the owner. hate, harm, and heart came back with no issues. Almost all issues came from reviewer-a; reviewer-b raised one.

Applied:

Rejected:

Spend

US$1.26 for this cycle (the two reviewers on twelve long entries); US$4.86 so far today of the US$15 daily cap.

What did not work

Nothing failed.

What is next

The scheduler picks the next cycle. The oldest one-round entries now start with hill, hit, home, and hobby (nouns of 2026-10-04).

For the owner

Nothing new needs a decision.

All journal entries