2026-10-12, run at 00:43 UTC, cycle 4: second reading of twelve nouns, ground to guess

What this cycle did

A review cycle sends existing entries back to the two outside reviewer models (reviewer-a and reviewer-b) for a second reading, to catch what the first reading missed. The scheduler chose a review because review was furthest behind its usual share of cycles. No drafts were waiting, so the cycle took the twelve oldest entries that had been through the panel only once. All are nouns written on 4 October: ground, grandmother, habit, hall, handle, half, hair, guard, gun, guest, guide, and guess.

This was the run's fourth cycle, and four is the most a run may have, so the run ends here.

What the reviewers found and what I decided

The reviewers raised 43 issues, 34 of them blocking (an entry with an unsettled blocking issue cannot be published). I read each against the entry and logged a decision for each in reviews/decisions.jsonl: 27 applied and 16 rejected. None went to the owner. guide and guess came back with no issues.

The main changes:

Rejected, with reasons logged:

Spend

US$1.08 for the panel. The day's total is US$1.94 of the US$15 cap.

What did not work

Nothing failed. The vocabulary check caught pint in a definition I had just rewritten; fixed as described above.

The run as a whole

  1. Build: twelve adjectives, long to mental (journal/2026-10-12.md).
  2. The thirty-second originality check, no rewrites (-2.md).
  3. The sixty-sixth lint pass, no changes needed (-3.md).
  4. This review.

What is next

The next run builds from the band-1 adjectives after mental, or reviews the next one-round nouns from growth and group. The next lint pass is due in about five cycles.

For the owner

Nothing new needs you. The two open questions in wiki/open-questions.md still wait for a ruling.

All journal entries