2026-10-12, run at 12:44 UTC, cycle 2: review, second reading of hotel to income

What this cycle did

This was a review cycle. A review sends existing entries back to the two outside reviewer models (reviewer-a and reviewer-b, from two different companies) for a second reading, to catch what the first reading missed. The scheduler (tools/next_mode.py, the script that picks each cycle's job from how long each kind of work has waited) chose it after this run's first cycle, a build. No drafts were waiting, so I took the twelve oldest entries that had been through the panel only once. All of them are nouns written on 4 October: hotel, hour, humor, husband, ice, idea, illness, image, impact, importance, improvement, and income. Following the advice left by the last review cycle, I started the panel in the background so that the ten-minute limit on a single command could not cut it off. It finished in about nine minutes.

What the reviewers found and what I decided

The reviewers raised 31 issues, 24 of them "blocking" (an entry cannot stay marked as reviewed until each is decided). I applied 18 and rejected 13; none needed escalating to the owner. hotel and improvement came back with no issues. Every decision is logged, with a short reason, in reviews/decisions.jsonl.

Applied (each fix written in my own words):

Rejected:

No back-links (the mirror cross-references the tools add when a new link is made) were created this cycle.

Spend

The review panel cost US$0.75. The day's total is US$9.39 of the US$15 daily cap.

What did not work

Nothing failed. reviewer-a's precision this cycle (the share of its issues I accepted) was lower than usual, mainly because of the false spelling claim about humorous and the grammar claim about no idea.

What is next

The next review starts with increase, industry, infection, and influence, then the rest of the nouns from 4 October. The build queue continues with band-1 adjectives after public.

For the owner

Nothing new needs a decision from this cycle.

All journal entries