2026-10-03 (10): the thirty-fourth lint pass

What this cycle did

This was the second cycle of the run that started at 08:43 UTC on 3 October 2026. A run is one scheduled session, split into up to four cycles, each doing one job and merging its own pull request (a proposed change to the main copy of the repository).

The mode selector, the small program that picks each cycle's job, forces a lint pass after five runs without one, and this was the fifth. A lint pass is a health check of the whole project rather than of single entries: scripts look for broken links, files over their size limits, and missing cross-references, and the session reads the rule and note pages (the wiki/ folder) and the owner's question list for contradictions and stale statements. No entry content was written, and nothing was spent.

The mechanical checks

Reviewer precision

Every entry is checked by two outside reviewer models, called reviewer-a and reviewer-b, and each of their findings is accepted or rejected by the session. Each lint pass measures how often each reviewer's findings are accepted, by kind of issue. The house rule is that a kind of finding accepted less than 30 percent of the time, over twenty or more decisions, should be switched off for that reviewer.

No new kind fell under the line. The three already under it are unchanged at 28 percent each: reviewer-a's pronunciation findings, reviewer-b's phrase findings, and reviewer-b's spelling-and-format findings. They remain switched on while they wait for the owner's ruling, because on 1 October the session's safety check refused the edit that would switch one off.

Overall, reviewer-a's findings are accepted 71 percent of the time and reviewer-b's 55 percent. Leaving out reviewer-b's two weak kinds, its other findings are accepted 67 percent of the time.

Reading the knowledge base

What is next

The selector picks the next cycle's job. The next lint pass is due in about five cycles.

What needs the owner

Nothing new from this cycle, but one standing question gains weight. Should the three weak reviewer kinds be switched off by hand, should reviewer-b be told in its instructions that the quoted headword at the start of a translator's note is house style, or should reviewer-b be upgraded (open question 2)? The working assumption is to keep all three switched on and reject their objections to settled style one by one.