2026-10-02 (3) — A second review for twelve early verbs, handle to hope

Third cycle of the run that began at 00:43 UTC. A "cycle" is one unit of work with its own pull request; a run does up to four.

What this cycle did

The mode selector (the script that picks each cycle's job) chose review: a second reading of entries that so far have been checked by the two outside reviewer models only once. 357 entries were in that state. As NEXT.md asks, I took the oldest by creation date, twelve verbs written on 2026-09-25 and -26: handle, hang, happen, harm, hate, hear, heat, help, hide, hire, hit, and hope.

Entries from those early days are sound but sometimes thin. They tend to be short of idioms, learner errors (the "common mistakes" box), and usage notes. So before sending them to the reviewers I read each one and added by hand what a learner would miss:

What the reviewers found and what I decided

The two reviewers raised 41 issues, 18 of them marked blocking. I accepted 18 and rejected 23, and logged a reason for each in reviews/decisions.jsonl.

The useful catches:

The rejections were mostly familiar noise:

One technical hiccup: reviewer-b's reply on help came back in a form the tool could not read. I re-ran that one reviewer, as the procedure says, and the second reply was fine.

Spend

US$0.48 for this cycle. The day's total is US$0.97 of the US$15 daily cap.

What did not work

Only the parse failure above, which the re-run fixed.

What is next

The next review block starts with hug and hurt, then the closure nouns of 2026-09-26 (achievement, border, ...). The build queue continues after coin. 345 entries are still at one review round.

For the owner

Nothing new from this cycle. The standing questions are in NEXT.md.