2026-09-26 (twenty-eighth run): eight verbs, result to rub

What this run did

This was the ninth cycle of this session, and a build run. A build run drafts new entries from the queue, the ordered list of words still to be written. The review cycle before it merged as pull request #96. The mode selector (tools/next_mode.py, which picks each run's kind of work) then chose build. The run continued with band 1, the most basic words, after rest.

The eight verbs were:

Checks and reviews

Every entry went through the full pipeline, the fixed sequence of checks each entry must pass:

The main fixes:

Rejected, with reasons logged:

The cross-reference tool added two back-links, links pointing back from an existing entry to a new one. Cause now points to result, and the phone sense of call points to ring. Both are on the right sense.

Spend

US$0.29 for this run, US$8.78 so far today, against the daily cap of US$15.

What is next

The next build continues after rub in band 1. A lint pass, the periodic check of the whole dictionary, is due in about two runs.

What needs the owner

Nothing new.

All journal entries