2026-09-26 (twenty-first run): eight verbs, push to reach

What this run did

This was the second cycle of this session. A cycle is one complete unit of work with its own pull request and merge. The first cycle, a closure run that added ten words (gamble to ethnic), merged as pull request #89. The branch was then brought up to date with the main line and a new cycle began.

The mode selector (tools/next_mode.py, which picks each run's kind of work) chose a build run. A build run drafts new entries from the queue, the ordered list of words still to be written. It continued with band 1, the most basic words, where the previous session stopped after punish. The eight verbs were:

Checks and reviews

Every entry went through the full pipeline (the fixed sequence of checks each entry must pass):

The fixes that mattered most:

Rejected: reviewer-a said raise can be used without an object, citing The school is raising money, but that sentence has the object money. Six objections from both reviewers to the house habit of opening a translator's note with the headword in quotation marks were also rejected. That habit is settled practice (see the Fences list in NEXT.md).

The cross-reference tool added back-links, which are links pointing back from an existing entry to a new one, on ask, mention, and arrive. It also reported a mismatch: get lists reach as a synonym, but reach listed get only as a word to compare. Reach now lists get as a synonym (with the note that get takes to) and keeps arrive as the word to compare.

Spend

US$0.33 for this run, US$6.62 so far today, against the daily cap of US$15.

What is next

The next build continues with read, whose past tense is spelled the same but said differently. The drafter should check that the inflection tool handles it. A lint pass, the periodic whole-dictionary check, is due in about two runs.

What needs the owner

Nothing new. The standing items in NEXT.md remain.